Human and Organizational Factor Considerations at Nuclear Power Plants in Pakistan
Abstract
Keywords
References
. Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety, The Accident at TEPCO’s Fukushima Nuclear Power Stations, Japan, June 2011.
. Pakistan’s Sixth National Report to Convention on Nuclear Safety, 2014.
. NUREG 0700, “Human-System Interface Design Review Guidelines†Rev. 2, USNRC, Washington, 2002
. NUREG 0711, “Human Factors Engineering Program Review Model†Rev. 3, USNRC, Washington, 2011.
. NUREG 0800, “Standard Review Plan – Human Factors Engineering†USNRC, Washington, 2007.
. PAK-911, Regulations on the Nuclear Power Plant Design, January 2002, Rev. 1, PNRA, Islamabad.
. PAK-913, Regulations on Safety of Nuclear Power Plant Design, Rev. 1, 2004, PNRA, Islamabad.
. The Fukushima Nuclear Accident Independent Investigation Commission Report, Japan, 2012.
. Nuclear Power-Control, Reliability and HFs, Edited by Pavel V. Tsvetkov, InTech, 2011.
. PSAR of Chashma Nuclear Power Plant Unit-2, May 2005.
. PSAR of Chashma Nuclear Power Plant Units-3/4, October 2010.
. PSAR of Karachi Nuclear Power Plant Unit-2, January 2014.
. FSAR of Chashma Nuclear Power Plant Unit-2, March 2009.
. FSAR of Chashma Nuclear Power Plant Units-3/4.
. Periodic Safety Review of Chshma Nuclear Power Plant Unit-1, 2010.
. Pakistan’s Special National Report to Convention on Nuclear Safety, 2012.
. SF-1, Fundamental Safety Principles, IAEA, Vienna, 2006.
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution 3.0 License.
"No endorsement" policy: Unless explicitly stated otherwise, the opinions, analyses, discussions, views and recommendations outlined in the articles published in the International Nuclear Safety Journal (INSJ) are solely those of their respective authors and not of the editors, owners or publishers of the INSJ.